Horizontal Directional Drilling

Jafurah Project

HDD and installation of carbon steel pipelines from 8″ to 42″ with FOC ducts, over a total of 1,700 m.

Project OwnerSaudi Aramco
8″–42″

Pipe

1,700 m

Length

Scope of Work

  • HDD and installation of 8″, 12″, 16″, 30″, 36″ and 42″ carbon steel pipelines
  • HDD and installation of FOC ducts
  • Total length: 1,700 m

Where the work was

Site
Jafurah Field, Saudi Arabia
Project owner
Saudi Aramco
Total installed
1,700 m

The pin marks the field or corridor, not the exact crossing — the precise alignment is commercially sensitive.

Open in maps
Let's Talk

Ready to Break Ground?

Tell us about your crossing, foundation, or excavation support project, and our engineering team will get back to you.

Email Usinfo@gambitgulf.com
Qambit AlkhaleejBuilding 3837, Abdullah Al Nahawi St, Sayhat 32461, Kingdom of Saudi Arabia