Horizontal Directional Drilling
Sales Gas Supply Pipeline to Yanbu — Phase 3
HDD and installation of a 36″ diameter steel pipeline over 700 LM.
Project OwnerSaudi Aramco
36″
Pipe
700 m
Length
Scope of Work
- HDD and installation of 36″ diameter steel pipeline — 700 LM
Where the work was
- Site
- Yanbu, Saudi Arabia
- Project owner
- Saudi Aramco
- Total installed
- 700 m
The pin marks the field or corridor, not the exact crossing — the precise alignment is commercially sensitive.